A project schedule with a fixed task column and a scrolling date axis: phased bars, progress, milestones and a today marker.

pnpm dlx shadcn@latest add @haze/gantt-chart
Open preview in a new tab
Liveno JavaScript

When to use

  • A launch or project plan needs to show which tasks overlap and where the milestones fall.
  • Task status and progress must read at a glance next to the dates.
  • A read-only schedule goes in a status report or client portal.

When not to use

  • The list has no dates, only order; use timeline or a plain list.
  • Users drag bars to reschedule or link dependencies; that needs a scheduling tool, not this display.
  • A single metric over time is plotted; use area-chart or bar-chart.

Installation

Add the Haze registry to components.json once, then install Gantt chart with the shadcn CLI. Works in any Astro project with Tailwind CSS v4.

pnpm dlx shadcn@latest add @haze/gantt-chart
First time? Registry and theme setup

1. Add to components.json:

{
  "registries": {
    "@haze": "http://localhost:4329/r/{name}.json"
  }
}

2. Install the theme once: npx shadcn@latest add @haze/theme, then import it after Tailwind in your global CSS:@import "./haze.css";

API reference

PropTypeDefaultDescription
tasksTask[]launch demoRows with name, phase, start, end (ISO dates, end inclusive), owner initials, progress 0-100, status and milestone.
labelstringProduct launch schedule, scroll sideways to see all datesAccessible name of the scrollable timeline region.
scale"day" | "week"weekWeek shows one label per Monday; day adds a number for every day and a wider axis.
weekendsbooleantrueShades Saturdays and Sundays.
todaystring2026-11-12ISO date for the today marker. Pass an empty string to hide it. The component never reads the clock.
todayLabelstringTodayText of the today marker.
taskHeadingstringTaskHeader of the task column.
ownerLabelstringOwnerScreen reader word read before the owner initials.
doneLabelstringdoneWord after the progress percentage.
localestringenBCP 47 locale for dates, formatted in UTC.
classstring–Classes for the outer panel.

Keyboard interactions

Tab, then arrow keys
Focus the timeline region and scroll it sideways.

Accessibility

  • Every bar has its meaning as visible text in the task column: dates, percent done, owner and a status word with an icon, so nothing relies on color or bar length.
  • The bars, axis and today marker are decorative and hidden from assistive technology; milestones read as 'Milestone, <date>'.
  • The scroll region is focusable and named, so keyboard users can pan the timeline with the arrow keys.

Notes for AI

Copy into Claude Code, Cursor, Codex or any coding agent. Agents can also read the Markdown version of this page.

  • Install and use

    Install the Haze UI component "Gantt chart" with `npx shadcn@latest add @haze/gantt-chart`. If components.json has no "@haze" registry yet, add "registries": { "@haze": "http://localhost:4329/r/{name}.json" }. If src/styles/haze.css does not exist yet, run `npx shadcn@latest add @haze/theme` once and import it from the global stylesheet after Tailwind. The CLI stops at an overwrite question when a Haze file already exists and differs, even with --yes, and then installs nothing after it: read its output. If the user has not edited their Haze files, re-run with --overwrite to take the registry versions; if they have, ask them before overwriting. Then import GanttChart from "@/components/haze/ui/gantt-chart.astro" (or the relative path) and render it where it fits the page. Keep Haze token classes (bg-background, text-muted-foreground, border-border...) and never hardcode colors. Docs: http://localhost:4329/ui/gantt-chart.md

  • Customize with real content

    Adapt the Haze gantt-chart ui for our product. Replace the demo values of these props with our real content: tasks, label, scale, weekends, today, todayLabel, taskHeading, ownerLabel, doneLabel, locale, class. Keep the layout, the heading level rules and these accessibility details: Every bar has its meaning as visible text in the task column: dates, percent done, owner and a status word with an icon, so nothing relies on color or bar length. The bars, axis and today marker are decorative and hidden from assistive technology; milestones read as 'Milestone, <date>'. The scroll region is focusable and named, so keyboard users can pan the timeline with the arrow keys. Do not add raw color classes; use the Haze tokens.

  • Choose the right block

    Before using gantt-chart, check it fits: use it when a launch or project plan needs to show which tasks overlap and where the milestones fall.; task status and progress must read at a glance next to the dates.; a read-only schedule goes in a status report or client portal.. Avoid it when the list has no dates, only order; use timeline or a plain list.; users drag bars to reschedule or link dependencies; that needs a scheduling tool, not this display.; a single metric over time is plotted; use area-chart or bar-chart.. Alternatives: @haze/timeline, @haze/bar-chart, @haze/table.

Dependencies

  • npm: @lucide/astro
  • @haze/utils
  • @haze/theme (one-time setup)

Source · Original Haze UI work.

Catalog

↑↓ moveEnter openEsc close

Keyboard shortcuts

CtrlK
Command palette
/
Focus search
←↑→↓
Move between cards
jk
Next / previous card
ci
Copy code / install command (detail page)
[]
Previous / next entry
?
This help
Esc
Close dialog